3/37 Eversleigh Road Belmont 0622
Belmont
Public facts
- Application number
- SUB60471707
- Application type
- Subdivision Consent Application
- Lodged date
- 28 Sept 2026
- Local Board
- Devonport-Takapuna
- Address
- 3/37 Eversleigh Road Belmont 0622
- Public description
- To seek consent for crosslease update following building additions
Applications within 500 m
11 other applications within 500 m. The 8 nearest are below.
- SUB60471545 · Subdivision Consent Application57 Eversleigh Road Belmont 0622 · 220 m · Lodged 22 Sept 2026 · Lodged
To undertake a subdivision to reflect the Land Exchange Agreement between Auckland Council and Summerset.
- SUB60468721 · Subdivision Consent Application5 Fifeshire Street Belmont 0622 · 310 m · Lodged 21 Jul 2026 · Lodged
Lots 1 to 3, Lot 4 JOAL being a proposed subdivision of Lot 10A DP 47034
- LUC60468720 · Land Use Consent Application5 Fifeshire Street Belmont 0622 · 310 m · Lodged 21 Jul 2026 · Lodged
Construct three dwellings.
- LUC60469891 · Land Use Consent Application265 Lake Road Belmont 0622 · 380 m · Lodged 17 Aug 2026 · Lodged
A second dwelling is proposed on the subject site, being built within a mapped OLFP.
- BPA70028364 · Boundary Permitted Activity265 Lake Road Belmont 0622 · 380 m · Lodged 13 Jun 2026 · Lodged
Construction of a new residential dwelling with a reduced side yard setback to the northeast boundary. The proposed dwelling provides a minimum setback of appro
- OPW60465730 · Outline Plan of Work Application210 Lake Road Belmont 0622 · 380 m · Lodged 13 May 2026 · Lodged
Construction of a central square (Atea) and associated landscaping
- WAT60470191 · Water Consent application73 Eversleigh Road Belmont 0622 · 390 m · Lodged 21 Aug 2026 · Lodged
WAT to Divert-Groundwater To undertake works associated with construction of retirement village: infrastructure, parking, access and loading, site-wide landscap
- LUC60470190 · Land Use Consent Application73 Eversleigh Road Belmont 0622 · 390 m · Lodged 21 Aug 2026 · Lodged
To undertake works associated with construction of retirement village: infrastructure, parking, access and loading, site- wide landscaping, and temporary and pe
Record fetched: .