Outline plans and outline plan waivers

An outline plan tells the council about work a requiring authority plans on designated land. An outline plan waiver means the council does not require an outline plan for that work.[1][2][3]

Last reviewed 12 Oct 2026. This page explains the usual process in general terms. It is not legal advice; the council's decision documents govern any particular application.

New Zealand is replacing the Resource Management Act 1991 with the Planning Act 2026 and the Natural Environment Act 2026. The transition period starts on 30 October 2026. Resource consent applications lodged before then continue under the Resource Management Act as it was before the Planning Act 2026 received royal assent. Applications lodged during the transition are processed under the Resource Management Act as in force when they are lodged. This page will be updated when that changes.[4][5][6]

What this application is

A designation sets land aside for public works or network utilities. Auckland Council gives roads, telecommunications facilities, schools and prisons as examples. Wellington City Council says only requiring authorities can designate land, and that a requiring authority can be a Minister of the Crown, a local authority or an approved network utility operator.[2][7]

Auckland Council says that once a designation is in the plan the works can be carried out at any time, and that the responsible authority does not have to comply with Unitary Plan rules but must tell the council by submitting an outline plan of works. Wellington City Council says a requiring authority does not need resource consent for a project that breaks District Plan rules, as long as the project is for the designated purpose and complies with the designation conditions; instead it submits an outline plan or asks for an outline plan waiver.[2][7]

Section 176A of the Resource Management Act 1991 says the requiring authority must submit an outline plan of work to be constructed on designated land to the territorial authority, so that the territorial authority can request changes before construction starts. The outline plan must show the height, shape and bulk of the work, its location on the site, the likely finished contour of the site, vehicle access, circulation and parking, the proposed landscaping, and any other matters to avoid, remedy or mitigate adverse effects on the environment. The section also applies to work a territorial authority plans to construct on designated land.[1]

Under section 176A(2), an outline plan is not needed if the work has been otherwise approved under the Act, if its details are already incorporated into the designation, or if the territorial authority waives the requirement. Wellington City Council says waivers are for works that do not necessarily need an outline plan, such as replacing windows or building outdoor stairs at a school, and that it decides after considering the nature and level of the works and their likely effects.[1][3]

An outline plan is not a resource consent. Auckland Council says the work should fit the use of the site set out in the designation, such as a classroom on a site designated for the Ministry of Education, and that if it does not, the requiring authority (for example Spark or Watercare) needs a resource consent instead. Wellington City Council says building projects on designated land still need a building consent before building work can begin.[2][7][3]

An outline plan or waiver in a council's list shows that a requiring authority submitted a plan or asked for a waiver, not that the council accepted it.[2][3]

Under the Planning Act 2026, a designation in place immediately before the specified transition date will be treated from that date as a designation under Schedule 5 of that Act, on the same terms and conditions, and an outline plan of works in effect immediately before that date will be treated as a construction project plan. The continued designation stops having legal effect when the relevant land use plan under that Act becomes operative. The specified transition date is a date to be set by Order in Council, for the whole country or for particular regions or areas.[8][9]

What neighbours can do

Both councils say the public cannot make submissions on an outline plan. Auckland Council says the exception is when it publicly notifies the initial move to designate a site for a specific use. Wellington City Council says outline plans are not open for submissions from members of the public or affected parties.[2][7]

Auckland Council says designations are identified in chapter K of the Auckland Unitary Plan. Wellington City Council says designated areas are shown on its District Plan maps and that its schedule of designations gives specific details, such as any restrictions or provisions in an area.[2][7]

Notification

Section 176A has no public or limited notification step and no submission process for an outline plan. Within 20 working days after receiving an outline plan, the territorial authority may ask the requiring authority to make changes, but must not ask for a change that is inconsistent with an infrastructure design solution the work relies on.[1][2][7]

If the requiring authority decides not to make the requested changes, section 176A(5) lets the territorial authority appeal to the Environment Court within 15 working days after being notified of that decision. The Court must consider whether the requested changes will give effect to the purpose of the Act and to any infrastructure design solution the work relies on.[1][2]

In Auckland

Auckland Council says it needs 20 working days to assess an outline plan and may ask the requiring authority to make changes. Its fee schedule lists an outline plan of works and a waiver of outline plan as separate application types.[2][10]

In Wellington City

Wellington City Council says it takes up to 20 working days to assess an outline plan and that it may contact the requiring authority to recommend changes. It says that if the requiring authority has not received confirmation after 20 working days, and the council has not formally extended the time frame, the authority can start work on the site.[3]

Wellington City Council says an outline plan waiver usually takes fewer than 20 working days to assess, and recommends that a requiring authority discuss a waiver with it before asking for one.[3]

Read the council's own guidance

Sources

  1. Resource Management Act 1991, section 176A: Outline plan, New Zealand Legislation (Parliamentary Counsel Office) (accessed 2026-10-12)
  2. Designations and outline plans, Auckland Council (accessed 2026-10-12)
  3. Outline plan of works on designated land, Wellington City Council (accessed 2026-10-12)
  4. Planning Act 2026, Schedule 1 (transitional, savings, and related provisions), clauses 3, 18 and 19, New Zealand Legislation (Parliamentary Counsel Office) (accessed 2026-10-12)
  5. Planning Bill and Natural Environment Bill pass Third Reading, Ministry for Cities, Environment, Regions and Transport (accessed 2026-10-12)
  6. The Planning Act 2026 and Natural Environment Act 2026 are in force: What you need to know now, MinterEllison (accessed 2026-10-12)
  7. Designated land for public works and network utilities, Wellington City Council (accessed 2026-10-12)
  8. Planning Act 2026, Schedule 1, clause 63: Designations, New Zealand Legislation (Parliamentary Counsel Office) (accessed 2026-10-12)
  9. Planning Act 2026, Schedule 1, clause 4: Order in Council specifying when new legislation applies nationally or to specified regions or areas, New Zealand Legislation (Parliamentary Counsel Office) (accessed 2026-10-12)
  10. Resource consent fees and deposits (plus notices of requirement and private plan change requests), Auckland Council (accessed 2026-10-12)

Applications NearBuild has recorded

Auckland

NearBuild holds 118 applications of this kind from Auckland Council's list, lodged between 16 Feb 2026 and 22 Oct 2026. That is 1% of the Auckland applications NearBuild holds.

Council wording included
Council wordingApplications
Outline Plan of Work Application118

Outline plans per month in Auckland

  1. 7 (partial month)
  2. 13
  3. 14
  4. 17
  5. 13
  6. 7
  7. 19
  8. 18
  9. 10 (partial month)

A partial month is one where NearBuild's records start part-way through it or stop before it ends.

Suburbs with the most applications of this type

  1. Papakura (7)
  2. Flat Bush (6)
  3. Manurewa (5)
  4. Auckland Central (4)
  5. Bucklands Beach (4)
  6. Henderson (4)
  7. Papatoetoe (4)
  8. Mangere Bridge (3)
  9. Otahuhu (3)
  10. Waiuku (3)

Wellington

NearBuild holds 99 applications of this kind from Wellington City Council's list, lodged between 28 Mar 2024 and 13 Oct 2026. That is 6% of the Wellington applications NearBuild holds.

Council wording included
Council wordingApplications
Outline Plan Waiver64
Outline Plan35

Outline plans per month in Wellington

  1. 1 (partial month)
  2. 3
  3. 2
  4. 4
  5. 4
  6. 0
  7. 5
  8. 3
  9. 5
  10. 5
  11. 2
  12. 2
  13. 5
  14. 3
  15. 2
  16. 6
  17. 2
  18. 6
  19. 3
  20. 3
  21. 4
  22. 4
  23. 1
  24. 1
  25. 1
  26. 0
  27. 7
  28. 3
  29. 6
  30. 2
  31. 3
  32. 1 (partial month)

A partial month is one where NearBuild's records start part-way through it or stop before it ends.

Suburbs with the most applications of this type

  1. Khandallah (10)
  2. Tawa (9)
  3. Mt Cook (6)
  4. Raroa (6)
  5. Thorndon (6)
  6. Johnsonville (5)
  7. Miramar (5)
  8. Newtown (5)
  9. Berhampore (4)
  10. Karori (4)

Latest recorded applications

39S Somerville Road Howick Auckland

Scenic Drive Titirangi

144 Park Estate Road Hingaia 2113

2-6 Onetaunga Road Chatswood 0626

2 MacLeans Road Bucklands Beach 2012

15 St Leonards Road Kelston

0 Waikowhai Street

2 Attwood Road Paremoremo 0632

42-60 Rathgar Road Henderson

33 Robertson Road MANGERE 2024

34 Ribblesdale Road Henderson

16 Kotuku Street Te Atatu Peninsula

340 Blockhouse Bay Road Avondale Auckland 0600

70 Hector Sanderson Road Great Barrier Island Auckland 0991

126 Sturges Road Henderson

37-69 Wellesley Street East Auckland Central Auckland 1010

30 Te Wharepouri Street

86 Hutt Road

18 De Havilland Road Hobsonville

27 Northcote Road Hillcrest 0627

Source and sync
SourceAuckland Council — Recent resource consent applications Data last updated
SourceWellington City Council — Recent resource consents Data last updated

Contains data from Wellington City Council, licensed under CC BY 4.0. CC BY 4.0 licence

Record fetched: .